We Are Moving Offices. What Do I Need to Plan for IT?

Order the internet connection first, because it has the longest lead time of anything in the move and nothing else works without it. Then sort the cabling before the furniture arrives, keep your phone numbers by porting them rather than cancelling, and make a list of everyone who needs the new address. Most office moves go wrong on the internet and the phones, and both are avoidable with an early start.

Internet comes first

Find out what the new building can get. An NBN connection is the usual answer, but the type varies by address and so does the wait to connect, and some buildings need a technician visit or new cabling to the room. Order as soon as the lease is signed. Keep the old connection running until the new one is tested, so there is no gap, and check whether the new address can take a business grade service with a fixed address if your phones or remote access depend on one. A mobile broadband device is a sensible fallback for the first days.

The move checklist

  1. Order the internet at the new address now, and ask for the install date in writing.
  2. Walk the new office and mark where every desk, printer, phone and Wi Fi point will go, then have the data cabling done while the walls are empty.
  3. Decide where the network cabinet goes. It needs power, ventilation and a door that locks.
  4. Port your phone numbers to the new service rather than cancelling. A cancelled number is gone, and porting takes time, so start early.
  5. List every device that moves, and photograph the back of each before unplugging so the cables go back the same way.
  6. Back up everything before the move. Server, storage box and anything that still lives on a single computer.
  7. Book the IT provider for the day before and the first morning, so the network is up before the staff arrive.
  8. Update the address on the website, Google Business Profile, email signatures, invoices, the ABN record, the bank, suppliers and your domain registrant contact.
  9. Check the printers, scanners, alarm and card terminal connect at the new site, since each may need new network settings.
  10. Keep the old office internet and phones until everything is confirmed working at the new one, then cancel.

Phones

If you have internet based phones, they move with the handsets and only need the new internet to work, though the registered address for emergency calls needs updating. If you still have a landline, this is the moment to move to internet phones rather than pay for a new line. Either way, keep the number.

What else breaks

Anything that was set up with the old office’s address or connection. Remote access that expects the old connection, security cameras, the alarm dialler, the door intercom, the printer that emails scans, and card terminals. Make a list on the way out and test each on the way in.

What to do next

We plan and run office moves as part of managed IT support, including the internet order, the cabling plan and the first morning on site. For the customer facing side, update your Google Business Profile the day you move, so people are not sent to the old address.

How early should I order the internet?
As soon as the lease is signed. It is the slowest piece and nothing else can be tested without it.

Can I keep my phone number if I change provider?
Yes. Ask the new provider to port it. Do not cancel the old service until the port is complete.

Do I need a server room?
Most small businesses need a lockable cabinet with power and air, not a room. If your files are in the cloud, the cabinet holds the modem, the switch and the phone equipment.